❄️ Data Centre Cooling
CDU Monitoring & PUE Optimization
Modbus TCPSNMPRedfishBACnet
Current PUE1.050
Optimized PUE1.042
Energy Savings2.3 kW
Annual Savings€3,628
Power distribution
4 CDUs onlineFacility Power Breakdown
262 kW
IT Load
13.2 kW
Current Cooling
10.9 kW
Optimized Cooling
IT Load
Cooling (current)
Cooling (optimized)
Thermal safety
moderate riskRisk Assessment
Max Return Temp36°C
Thermal Headroom9°C
Thermal Limit45°C
RedundancyN+1
Temperature margin
AI recommendations
Actions (5)
mediumsetpoint
CDU-A2 (GPU Cluster 2): Raise supply setpoint from 17°C to 23.0°C (9.0°C headroom available)
Saves ~0.95 kW
mediumsetpoint
CDU-A1 (GPU Cluster 1): Raise supply setpoint from 18°C to 25.0°C (11.0°C headroom available)
Saves ~0.84 kW
mediumsetpoint
CDU-B1 (HPC Rack): Raise supply setpoint from 20°C to 25.0°C (13.0°C headroom available)
Saves ~0.39 kW
mediumsetpoint
CDU-B2 (Storage): Raise supply setpoint from 22°C to 25.0°C (17.0°C headroom available)
Saves ~0.12 kW
mediumsetpoint
CDU-C1 (Standby): Raise supply setpoint from 20°C to 25.0°C (25.0°C headroom available)
Saves ~0 kW
Fleet overview
CDU Status
CDU-A1 (GPU Cluster 1)online
Supply: 18°C
Return: 34°C
ΔT: 16°C
Load: 85 kW
COP: 21.3
Util: 63%
CDU-A2 (GPU Cluster 2)online
Supply: 17°C
Return: 36°C
ΔT: 19°C
Load: 120 kW
COP: 22.6
Util: 60%
CDU-B1 (HPC Rack)online
Supply: 20°C
Return: 32°C
ΔT: 12°C
Load: 45 kW
COP: 17.3
Util: 67%
CDU-B2 (Storage)online
Supply: 22°C
Return: 28°C
ΔT: 6°C
Load: 12 kW
COP: 9.2
Util: 72%
CDU-C1 (Standby)standby
Ready for N+1 failoverDemo scenario: 5-CDU data centre with GPU clusters, HPC racks, and storage cooling. Real deployments connect via Modbus TCP/SNMP to CoolIT, Vertiv, and Schneider CDUs for live telemetry and control.