❄️ Data Centre Cooling

CDU Monitoring & PUE Optimization

Modbus TCPSNMPRedfishBACnet
Current PUE1.050
Optimized PUE1.042
Energy Savings2.3 kW
Annual Savings3,628
Power distribution

Facility Power Breakdown

4 CDUs online
262 kW
IT Load
13.2 kW
Current Cooling
10.9 kW
Optimized Cooling
IT Load
262.0 kW
Cooling (current)
13.2 kW
Cooling (optimized)
10.9 kW
Thermal safety

Risk Assessment

moderate risk
Max Return Temp36°C
Thermal Headroom9°C
Thermal Limit45°C
RedundancyN+1
Temperature margin
9°C
AI recommendations

Actions (5)

mediumsetpoint

CDU-A2 (GPU Cluster 2): Raise supply setpoint from 17°C to 23.0°C (9.0°C headroom available)

Saves ~0.95 kW

mediumsetpoint

CDU-A1 (GPU Cluster 1): Raise supply setpoint from 18°C to 25.0°C (11.0°C headroom available)

Saves ~0.84 kW

mediumsetpoint

CDU-B1 (HPC Rack): Raise supply setpoint from 20°C to 25.0°C (13.0°C headroom available)

Saves ~0.39 kW

mediumsetpoint

CDU-B2 (Storage): Raise supply setpoint from 22°C to 25.0°C (17.0°C headroom available)

Saves ~0.12 kW

mediumsetpoint

CDU-C1 (Standby): Raise supply setpoint from 20°C to 25.0°C (25.0°C headroom available)

Saves ~0 kW

Fleet overview

CDU Status

CDU-A1 (GPU Cluster 1)online
Supply: 18°C
Return: 34°C
ΔT: 16°C
Load: 85 kW
COP: 21.3
Util: 63%
CDU-A2 (GPU Cluster 2)online
Supply: 17°C
Return: 36°C
ΔT: 19°C
Load: 120 kW
COP: 22.6
Util: 60%
CDU-B1 (HPC Rack)online
Supply: 20°C
Return: 32°C
ΔT: 12°C
Load: 45 kW
COP: 17.3
Util: 67%
CDU-B2 (Storage)online
Supply: 22°C
Return: 28°C
ΔT: 6°C
Load: 12 kW
COP: 9.2
Util: 72%
CDU-C1 (Standby)standby
Ready for N+1 failover
Demo scenario: 5-CDU data centre with GPU clusters, HPC racks, and storage cooling. Real deployments connect via Modbus TCP/SNMP to CoolIT, Vertiv, and Schneider CDUs for live telemetry and control.