🚛 EV Fleet & Depot
Smart Charging Infrastructure
OCPP 1.6/2.0ISO 15118Modbus
Charging Power148 kW
Optimized61.7 kW
Cost Savings96%
Annual Savings€11,389
Fleet status
0 readyVehicle Readiness
0
Ready
4
Charging
1
At Risk
52%
Avg SOC
Grid connection
Capacity Analysis
Connection Limit400 kW
Current Draw268 kW
Peak Demand148 kW
Headroom132 kW
Grid utilization
Can add 6 more chargers
Battery levels
Vehicle SOC
Van #01 (e-Sprinter)06:00
Van #02 (e-Sprinter)07:00
Van #03 (e-Expert)06:30
Van #04 (e-Expert)08:00
Truck #01 (eActros)05:00
Demo scenario: 6-charger depot with 5 commercial vehicles, 80kW solar array, and V2G-ready infrastructure. Real deployments connect via OCPP to ABB, Kempower, and Tritium chargers.